AGP Picks
View all

319th RW completes $20.4 million runway resurfacing project

News originally published by

DVIDS - Georgia

GRAND FORKS AIR FORCE BASE, N.D. – The 319th Reconnaissance Wing marked the completion of a $20.4 million runway resurfacing project with a ribbon-cutting ceremony Oct. 28, 2026, commemorating a major infrastructure milestone that will support military aviation and mission readiness for years to come.

The project resurfaced 10,270 feet of the installation's 12,351-foot primary runway, replacing the top four inches of aging pavement that had supported flight operations for more than two decades. Construction began earlier this year and was completed in September, ahead of the original six-month construction timeline.

Resurfacing this runway required solving two challenges at once: improve the infrastructure here at Grand Forks and sustain the RQ-4 mission our combatant commanders depend on around the world.

During construction, the 319th RW temporarily relocated its RQ-4 Global Hawk Block 40 aircraft and associated operational support functions to Robins Air Force Base, Georgia, to sustain mission success.

The relocation came as mission demands increased, requiring the wing to sustain operations while adapting to the temporary change in location.

“We were operating at three times the operational tempo we had previously experienced with the Global Hawk Program,” said Col. Alfred Rosales, the 319th RW commander. “There could be no gaps in the mission. It had to continue.”

Maintaining operations required close coordination among personnel across multiple organizations. Airmen and civilian personnel worked to move equipment, establish operational support for the temporary location and coordinate construction activities while ensuring mission requirements continued to be met.

Rosales recognized Airman and civilian personnel whose planning and coordination helped support operational requirements throughout construction.

Airman 1st Class Sherri Maldonado, a 319th Logistics Readiness Squadron ground transportation operator, was among those recognized during the ribbon-cutting ceremony for her contributions to the relocation.

“The work we do everyday makes a difference,” said Maldonado. “Even the smallest tasks play an important role in supporting the bigger mission.”

The project preserves critical airfield infrastructure needed to safely launch and recover aircraft and accommodate a range of aircraft and respond to evolving mission requirements.

“This effort required tremendous commitment and attention to detail from everyone involved,” said Rosales.“Even when the runway is closed, our Airmen at the 319th RW are ready to reposition our forces and maintain our operational tempo.”

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Airline Industry Today

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.